10 Orange street, London – United Kinkdom. WC2H 7DQ
project detail
The Tissmoumine Copper Project, operated by Remindev Mining, a subsidiary of Artemis MM Resources London Ltd, represents one of the most promising copper development opportunities in southern Morocco. Located in the Taghbalt region of the Ouarzazate Province, within the Anti-Atlas metallogenic belt, the project lies in a historically mineralized district known for hosting several polymetallic occurrences rich in copper, silver, and zinc.
Geological Context
The Tissmoumine deposit is characterized by copper mineralization hosted in volcanic and volcano-sedimentary formations, where both sulphide and carbonate ores are present within tectono-metamorphic structures of the Anti-Atlas. Geological studies conducted by ONHYM and independent consultants have confirmed the presence of stratiform and vein-type mineralization, dominated by chalcopyrite, bornite, and malachite, with minor silver and zinc occurrences.
The mineralized zone extends laterally across several hundred meters, with strong structural control linked to regional fault systems. Comprehensive exploration campaigns and sampling have confirmed the presence of measured resources estimated at approximately 2.4 million tonnes of ore grading 2.5% Cu, with potential for upward revision as exploration advances.
Mining and Processing Plan
Artemis’ development plan for the Tissmoumine deposit follows a phased approach, beginning with the installation of a pilot processing plant designed to optimize metallurgical recovery and validate the beneficiation process. The pilot operation will provide critical data to support the design of a future full-scale industrial plant.
The production process includes three key stages:
- Extraction– Conventional drilling, blasting, loading, and haulage from near-surface zones.
- Processing– Crushing, grinding, and flotation to produce a copper concentrate exceeding 28% Cu.
- Logistics– Haulage and transport to port for FOB (Free on Board)
Preliminary metallurgical work indicates a processing recovery rate of approximately 78%, which can be further improved through optimization of sulphide ore treatment. The plant will operate with a scalable capacity, initially handling 100 tonnes per day, with gradual expansion toward full-scale production once technical validation is achieved.
Infrastructure and Logistics
The project benefits from excellent infrastructure, supported by Morocco’s ongoing national investments in the southern region. The site is connected to a reliable road network linking Taghbalt to Ouarzazate and Agadir, ensuring access to industrial centers and export terminals.
Morocco’s modern logistics framework, including power supply, telecommunications, and new transport corridors, provides a strong foundation for efficient mining and export operations. The country’s commitment to renewable energy and mining modernization further enhances project viability and operational sustainability.
Strategic Outlook
Copper remains one of the world’s most critical industrial metals, essential to electrification, renewable energy, and infrastructure expansion. With demand expected to rise significantly over the next decade, the Tissmoumine project is well positioned to become a strategic source of high-grade copper concentrate in North Africa.
The project aligns with Artemis Mining’s long-term strategy to develop high-value base metal assets that support the global transition to cleaner energy systems. It also contributes directly to Morocco’s national objectives of diversifying mineral production and promoting regional development.
Sustainability and ESG Commitment
The Tissmoumine Project has been developed under Artemis’ ESG framework, emphasizing environmental responsibility, safety, and social impact. The project integrates:
- Controlled water management and recycling systems
- Minimal surface disturbance and rehabilitation plans
- Local employment and capacity-building initiatives
- Compliance with Moroccan and international environmental standards
This approach ensures that development proceeds responsibly, generating sustainable benefits for local communities and the broader region.
Conclusion
The Tissmoumine Copper Project combines a solid geological foundation, advanced technical studies, and a scalable development strategy. With confirmed mineralization, existing infrastructure, and strong alignment with global copper demand trends, it represents a cornerstone in Artemis MM Resources’ portfolio.
The phased implementation strategy — beginning with the pilot plant — provides both technical validation and investment security, paving the way for full-scale production and long-term value creation.
The project positions Artemis Mining as an emerging regional copper producer and a key contributor to Morocco’s modern mining landscape.